•The face of the tunnel is made smooth
with the help of hydraulic hammers.
•Holes of diameter 48mm to 51mm are
drilled on the face of top heading or benching with the help of a machine
called Boomer.
•The maximum length of the hole is kept
3m.
•The holes are filled with explosives and
connected to a non electric detonator. The detonating mechanism is placed at
least 500m distance from blast site.
•The detonator used for explosion is a non
electric detonator and is commonly called as Shock Tube Initiator.
![]() |
Boomer for hole drilling |
![]() |
Cortex tube for detonation purpose |
![]() |
Explosive |
Call: +91-141-7100123 for best quality wire mesh and filtration mesh manufacturer in India- WMW Metal Fabrics Ltd. is the leading wire mesh manufacturer and supplier India.
ReplyDelete